2-2-16-4-ustanovka-shatunnogo-podshipnika-i-kryshki.html
2.2.16.4. Installation of the shatunny bearing and cover
|
Fig. 2.176. Installation of the shatunny loose leaf
|
Establish shatunny loose leaves in a head and a rod cover, as is shown in drawing 2.176.
ATTENTION
At assembly and installation of a cover of a rod, level a rod and a rod cover in the area of a break.
|
Tighten shatunny bolts in two steps.
Inhaling moment:
- the first reception – 26–32 N · m;
- the second reception – 80–100 °.
|