Mazda 6 since 2002
1. Operation and car maintenance
2. Engine
2.1. General description of new engines of the L8, LF and L3 models
2.2. Mechanical part of engines
2.2.1. Engines of the L8 and LF models
2.2.2. Verification of the contents WITH / SN in the fulfilled gases
2.2.3. Compression measurement in engine cylinders
2.2.4. Check of a belt of a drive of auxiliary units
2.2.5. General information and safety measures at removal of the power unit
2.2.6. Hermetic removal
2.2.7. Removal and installation of the power unit
2.2.8. Check of the executive mechanism of change of phases of a gazoraspredeleniye (L3)
2.2.9. Removal and installation of the executive mechanism of change of phases of a gazoraspredeleniye (L3)
2.2.10. Chain of a drive of the mechanism of a gazoraspredeleniye
2.2.11. Removal and installation of the operating oil valve (OCV) (L3)
2.2.12. Check of the operating oil valve (OCV) (L3)
2.2.13. Check of operation of the zolotnikovy valve (OCV) (L3)
2.2.14. The general repair operations on the power unit
2.2.15. Check of a head of the block of cylinders
2.2.16. Assembly of the block of cylinders (beginning)
2.2.17. Assembly of the block of cylinders (termination)
2.2.18. Assembly of a head of the block of cylinders
2.2.19. Assembly of a drive of the mechanism of a gazoraspredeleniye
2.3. Appendix 1
2.4. Appendix 2
2.5. Appendix 3
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
 







2-2-5-obshhie-svedeniya-i-tekhnika-bezopasnosti-pri-snyatii-silovogo-agregata.html

2.2.5. General information and safety measures at removal of the power unit

If the decision on engine removal was made, before it hold preparatory events.
It is extremely important to define a place where works will be performed. Undoubtedly, the best place is the workshop. It is very important to have the equipped working platform, and also a place for car storage. If neither a workshop, nor the garage is not present, the equal smooth concrete or asphalt platform is required.
Washing of a motor compartment and the engine before removal will allow to keep the tool clean and a constant working condition.
Also will be necessary the lift or a telfer. Be convinced that these devices have a stock on loading capacity and are capable to lift the engine with all hinged units. Observance of security measures plays a paramount role, as engine lifting from the car – potentially dangerous operation.
If works on removal of the engine are carried out by the inexperienced person, the assistant will be necessary. Consult and ask to help persons who have experience of performance such works. There are many ways of performance of work on engine lifting from a motor compartment which exclude their performance alone.
In advance plan the actions. To Podgotovta all necessary tools and the equipment before beginning works. To some adaptations providing safety at removal and installation of the engine, and also decrease in labor costs belong (besides the lift) the strong supports, a full set of keys and opravka, wooden blocks, rags and solvent for cleaning of inevitable pools from the spilled operational liquids. If the lift will hire, agree about it in advance and perform all works at which this mechanism is not required. It will allow to save money and time.
Keep in mind that considerable time you cannot use the car. For performance of some works inaccessible in house conditions (in the absence of the special equipment), it is necessary to address to services of service station or a specialized workshop. These enterprises work according to the plan, therefore it will be expedient to consult there before engine removal precisely to estimate costs of time of repair and restoration of details.
At removal of the engine be always very attentive. Rash actions and haste can become the reason of serious traumas. In advance consider the actions. Do not feel sorry on it for time as the main thing is a work without traumas.

«previous page
2.2.4.5. Adjustment of thermal gaps in the mechanism of a drive of valves
following page»
2.2.6. Hermetic removal